ssively rocky and as I imaguied--
sufficicully forin in
with any
every part to dispont
extra precautions beyond w
those usually adopted, the wall hoverzi
for
a
length of 44 feet failed during
the excessive rais
it
mas
summer, and
of sum
then discovered that it was
caused by
water in a
atr
accumulation of r
bed of quicks and hidden
by the earth and rock work of the cutting, against which the wall had been placed - Simultaneously the wall, the sanc
with the
fall of
and some Land opposite
andering it impassabli
gave
way thus rend
am
bamboo scaffolding
at that point.
and bridge
were constricted in a
for days,
under no
height of
and the work was recommenced
ordinary difficulties in the wo~
the
Lainy
seasorr and withi
the springs and quicksands to m contend against.
nig inn
some ingularities occurring
the original work I told the Contractor
I would hold him responsible,
under the inst danse in his contract
of any
accident strould occur, and
when it did, without hesitation he
decided to rebuild the will which
has now
bem
effected, provision having been made for discharging the springs
from
the quick sand capped by
-slip of curth.
the
During the execution of this